Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal/biomass

11 unique locations (317 components)

Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (59 components)
• Aberthaw 7 OCGT fuel type distillate
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Coatbridge, ML5 4UG, Scotland (3 components)

Energy from Waste facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
EcoPark, Advent Way, Edmonton, London N18 3AG (13 components)

Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.

Active • 2025-26 (T-1), 2024-25 (T-4) ...
17.61 MW
Ferrybridge MFE Limited Kirkhaw Lane Off Stranglands Lane Knottingley West Yorkshire WF11 8DX (2 components)

FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (8 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 11 locations