Coal/biomass

18 unique locations (744 components)

Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (92 components)
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
• Aberthaw 9 OCGT fuel type is gasoil
Active • 2021-22 (T-4), 2022-23 (T-3) ...
2434.55 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (19 components)

Aberthaw 7 Coal fired unit

Active • 2021-22 (T-4), 2022-23 (T-3) ...
466.15 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (20 components)
• NB MPAN 1900070394446 -1900070467983. Allington Integrated Waste Management Facility Laverstoke Road 20-20 Business Park Maidstone Kent ME16 0LE. The auxiliary load is not included in the connection capacity i.e. The export is net.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
164.37 MW
Exeter ERF, Grace Road South, Exeter EX2 8QE (17 components)
• Energy from Waste Facility located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4.5 MW subject to calorific value of waste and biogenic content
Active • 2022-23 (T-4), 2023-24 (T-4) ...
13.53 MW
31252.77 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (10 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2024-25 (T-4), 2025-26 (T-4) ...
71.95 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (26 components)

Existing Energy from Waste Plant

Active • 2024-25 (T-4), 2025-26 (T-4) ...
65.23 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (32 components)
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
126.36 MW
"Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB" (21 components)
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
168.99 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (19 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
64.60 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (8 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
51.22 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2023-24 (T-4), 2024-25 (T-4) ...
3602.30 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (15 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
160.67 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (23 components)

Existing Energy from Waste Plant

Active • 2024-25 (T-4), 2025-26 (T-4) ...
65.33 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (23 components)

Existing Energy from Waste Plant

Active • 2024-25 (T-4), 2025-26 (T-4) ...
123.31 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (29 components)

Existing Energy from Waste Plant

Active • 2024-25 (T-4), 2025-26 (T-4) ...
128.53 MW
Loading map...
Showing 18 locations