Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal/biomass

23 unique locations (493 components)

Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (18 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.89 MW
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (5 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2018-19 (T-1) ...
18.89 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (17 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
85.19 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (5 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2018-19 (T-1) ...
23.34 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (17 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
82.14 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (4 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2019-20 (T-1) ...
20.55 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.06 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (4 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2019-20 (T-1) ...
9.28 MW
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (17 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
160.43 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (92 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9818.67 MW
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (13 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
63.32 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (12 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.59 MW
Mercia EnvirRecover EfW Oak Drive Hartlebury Trading Estate Hartlebury Worcestershire DY10 4JB (13 components)
• Mercia Waste Management Ltd Hartlebury Trading Estate Kidderminster DY10 4JB. In build Energy from Waste plant in Hartlebury. Auxilliary load is not included in connection capacity .i.e the export is net.
• This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 MW grid connection size, in line with rule 3.5.3 using historic data. Mercia Waste Management Ltd 250kT Energy from Waste plant with c. 19MW electrical output net. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
51.90 MW
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (10 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.74 MW
Lincoln EfW, Paving Way Off Whisby Road, North Hykeham, Lincoln, Lincolnshire, LN6 3QW (24 components)
• FCC Lincoln Energy From Waste Plant Paving Way off Whisby Road Lincoln LN6 3QW. Energy from waste plant located in North Hykeham. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 150kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic Output" FCC Environment Lincolnshire Ltd, 190kT Energy From Waste Plant with electrical output of c. 13MW. The auxiliary load is not included in the connection capacity. i.e.the export is net.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.76 MW
Kirklees Energy from Waste Plant Vine Street Huddersfield, Yorkshire HD1 6NT (20 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
37.67 MW
Greatmoor EfW, Greatmoor Road, Woodham, Aylesbury, Buckinghamshire, HP18 0QE (9 components)

This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
71.95 MW
Exeter ERF, Grace Road South, Exeter EX2 8QE (16 components)
• Energy from Waste Facility located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and biogenic content. Located in Grace Road, Exeter.
• Energy from Waste Facility which exports at between 3 MW and 4.5 MW subject to calorific value of waste and biogenic content
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.42 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
41184.15 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (70 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5 under the BSC. The metering for this unit is an aggregation of GEN5 and UT5.The net output of the CMU component will be the metered output for T_DRAXX-5 less the auxiliary load.
• This CMU component is a boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC. The metering for this unit is an aggregation of GEN6 and UT6.The net output of the CMU component will be the metered output for T_DRAXX-6 less the auxiliary load.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
268.28 MW
Drax Power Station, Drax, Selby, YO8 8PH (25 components)
• Generating Unit 4 at the Drax Power Station with BSC ID T_DRAXX-4.
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Chineham ERF, Whitmarsh Lane, Basingstoke, Hampshire, RG24 8LL (11 components)

Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.16 MW
Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (15 components)

This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
464.77 MW
Loading map...
Showing 23 locations