Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Coal/biomass

57 unique locations (1013 components) - Page 1 of 3

Wolverhampton EfW Crown Street West Midlands WV1 1QB (5 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Wolverhampton EfW Crown Street West Midlands WV1 1QB (3 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (33 components)
• West Burton A Power Station CMU 1 WA1-16 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
• West Burton A Power Station CMU 2 WA2-16 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• ... and 2 more unique descriptions
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Trident Park ERF, Glass Avenue, Cardiff, CF24 5EN (13 components)
• CARvwm is an Energy Recovery Facility (ERF) which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point)
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 35MW of power, although it is currently constrained by a grid connection of 31.43MW (at export meter point). Located in Glass Avenue, Cardiff.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
128.23 MW
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (18 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.89 MW
Tees Valley EfW Lines 1 & 2 Haverton Hill Road Billingham Cleveland TS23 1PY (5 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2018-19 (T-1) ...
18.89 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (17 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
85.19 MW
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (5 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2018-19 (T-1) ...
23.34 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (17 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
82.14 MW
STV Lines 4 & 5 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (4 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2019-20 (T-1) ...
20.55 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (15 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.06 MW
STV Line 3 EfW Haverton Hill Road Billingham Cleveland TS23 1PY (4 components)

Existing Energy from Waste Plant

Active • 2028-29 (T-4), 2019-20 (T-1) ...
9.28 MW
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (8 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (3 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (8 components)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
28.91 MW
Severnside Energy Recovery Centre Severn Road Hallen, Bristol South Gloucestershire BS10 7SP (5 components)
• Existing Energy from Waste Plant
• New Build Energy from Waste Plant
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Runcorn ERF, Barlow Way, Runcorn, Cheshire WA7 4HG (17 components)
• Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
• Existing generation unit.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
160.43 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (92 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U2 OCGT fuelled on Gas Oil as defined by BS2869 Class A2
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9818.67 MW
Potters Yard, Severn Road, Welshpool, Powys SY21 7YE (1 component)

Waste and biomass being combusted to raise steam to bar through a steam turbine

Inactive • 2021-22 (T-4)
Portsmouth ERF, Quartremaine Road, Portsmouth, Hampshire PO3 5QH (13 components)

Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
63.32 MW
Off Green Lane,Stewartby, Bedford, MK43 9LY. (1 component)

Energy from Waste facility located in Bedfordshire. The Facility will utilise conventional mass-burn technology, which is the most well proven Energy from Waste technology currently available. The process will consist …

Inactive • 2021-22 (T-4)
North Road, Eastham, CH65 1AJ (4 components)

Energy from waste Facility

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Newlands Road Wentloog Cardiff CF3 2EF (2 components)

Energy From Waste facility

Inactive • 2023-24 (T-4), 2021-22 (T-4)
Newhaven Erf, North Quay Rd, Newhaven, East Sussex, BN9 0AB (1 component)

Steam turbine at energy from waste facility located in Newhaven East Sussex

Inactive • 2021-22 (T-4)
Loading map...
Showing 25 locations