Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Cycle Gas Turbine (CCGT)

6 unique locations (38 components)

Basin Road South. Portslade. East Sussex. BN41 1WF (5 components)

Combined Cycle Gas Turbine plant

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (4 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2018-19 (T-1), 2017-18 (T-1)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (5 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
West Marsh Road, Spalding, Lincolnshire, PE11 2BB (6 components)

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3733.37 MW
Loading map...
Showing 6 locations