Combined Cycle Gas Turbine (CCGT)

14 unique locations (270 components)

Whitewall Road, Rochester, Kent, ME2 4DZ (5 components)

A series of gas generators on an existing site.

Active • 2024-25 (T-1), 2023-24 (T-1)
94.85 MW
TF11 (27 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
29.07 MW
ST. JOHNS COURT BRECON POWYS LD3 (13 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
158.22 MW
SL2 (33 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
141.83 MW
18.28 MW
Severn Power Station West Nash Road Nash Newport NP18 2BZ (19 components)
• Existing CCGT Unit
• Existing CCGT UnitSevern Power Station West Nash Road Nash Newport NP18 2BZ
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2324.67 MW
139.23 MW
OX4 (28 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
69.55 MW
ME16 (34 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
87.17 MW
Huntsman Drive, Seal Sands, TS2 1TT (6 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
191.90 MW
G33 (35 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
96.40 MW
FK9 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
21.16 MW
DENMARK CLOSE CORBY NORTHAMPTONSHIRE NN18 (15 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.85 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (15 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
291.40 MW
Loading map...
Showing 14 locations