Combined Cycle Gas Turbine (CCGT)

9 unique locations (213 components)

Land off Nobel Road, Wester Gourdie Industrial Estate, Dundee, DD2 4UH (13 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Combined Cycle Gas Turbine plant
• Gas fuelled Generating Sets
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
9.45 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (Nearest postcode to grid reference: M33 2JT). (9 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Storage Plant
• Single Shaft CCGT (Module 2)
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Battery Project on Greenfield Site
• New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation
Active • 2028-29 (T-4), 2024-25 (T-1) ...
48.57 MW
Liberty Lochaber Smelter, Fort William, Scotland PH33 6TH (53 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT Unit
• Hydro power turbine generator Unit 1 of the Lochaber Smelter hydro power plant, connected to a private network which in turn is connected to the local distribution network. The MPANs relate to the connection of the private network to the distribution network only. They will not be used for settlement purposes. Instead this CMU component will use bespoke net metering.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
Pattinson North Ind. Estate, Alston Rd, Washington, NE38 8QH, United Kingdom (42 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
• The CMU is a combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.02 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (9 components)
• A Battery Energy Storage System
• Aggregate CMU from multiple sources
• Single Shaft CCGT (Module 2)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
580.82 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.70 MW
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (32 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Existing CCGT
• The CMU is a gas fired CCGT CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
207.86 MW
Loading map...
Showing 9 locations