Combined Cycle Gas Turbine (CCGT)

3 unique locations (26 components)

Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (8 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2018-19 (T-1), 2019-20 (T-1)
547.88 MW
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Seals Sands Power Station North South Access Road Seal Sands Middlesbrough TS2 1FB (10 components)
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT
• One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT Export MPAN: 1574000199083
Inactive • 2020-21 (T-1), 2020-21 (T-4) ...
55.09 MW
Loading map...
Showing 3 locations