Combined Heat and Power (CHP)

14 unique locations (204 components)

Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (5 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (7 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (10 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
COFELY Great Coates, Grimsby, DN31 2TT (56 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
4.27 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (27 components)
• Gas Engine
• Gas engine
• Gas turbine generator
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.28 MW
Energy Centre, Quarryfield Road, Gateshead NE8 3BE (16 components)
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (5 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (11 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but derated at 95% due to their age). The total CMU generation capacity is declared 5.535MW and additional PSEUDO MPAN's are fitted.
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Par Docks, Par, Cornwall PL24 2SQ (18 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
1.68 MW
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (9 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Stubbins Hall Lane Waltham Abbey Essex EN9 2EE (7 components)
• Gas engines 1.54MW and 1.54MW in commercial horticultural environment with no auxilliary load. Only one engine used for Capacity Market purposes
• Two gas CHP engines 1.54MW. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.45 MW