Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

17 unique locations (30 components)

Wrekin Road Sutton Coldfield B73 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
Uplands Road Bromborough Wirral Merseyside CH62 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
UPHAM STREET Southampton SO32 (2 components)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• On-site existing CHP generating unit
Active • 2025-26 (T-1), 2018-19 (T-1)
7.01 MW
sutton bridge shrewbury shropshire SY3 (2 components)
• CHP on a hospital site
• EV charging at residential premises
Inactive • 2023-24 (T-1), 2018-19 (T-1)
SATURN WAY STRATFORD UPON AVON WARKWICKSHIRE CV37 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
Oak Leaf Drive Bamber Bridge Preston Lancashire PR5 (2 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. Kier Park, GU16 7EX SU871580
Inactive • 2019-20 (T-4), 2018-19 (T-1)
18.91 MW
Ninian Crescent Lenzie Kikintilloch GLASGOW East Dunbartonshire G66 (2 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. Holywell Business Park, CV47 0FG SP410612
Inactive • 2019-20 (T-4), 2018-19 (T-1)
18.91 MW
MARDENS HILL CROWBOROUGH EAST SUSSEX TN6 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
JENSON STREET COFTON HACKETT BIRMINGHAM B45 (2 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. Frog Island, RM13 8EN TQ512808
Inactive • 2019-20 (T-4), 2018-19 (T-1)
18.91 MW
HARROW DRIVE STOCKPORT SK4 (2 components)
• On-site existing CHP generating unit
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. Moorgate Point, L33 7XW SJ429977
Inactive • 2019-20 (T-4), 2018-19 (T-1)
7.56 MW
DOROTHY AVENUE THURMASTON LEICESTER LE4 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
BURY HILL VIEW DOWNEND BRISTOL BS16 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
BROADWAY BARNSLEY S70 (1 component)

On-site existing CHP generating unit

Inactive • 2018-19 (T-1)
Loading map...
Showing 17 locations