Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

19 unique locations (143 components)

530 London Road, Croydon CR7 7YE (7 components)

CHP (3)

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
5.72 MW
Blackshaw Rd, London SW17 0QT (8 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Denmark Hill, Brixton, London, SE5 9RS (10 components)
• CHP unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (5 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (7 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (7 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
James Cropper Plc, Burneside Mills, Kendal, LA9 6PZ (11 components)
• Gas fired CHP Unit
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Media City Prestwood Road Salford M50 2EQ (7 components)
• 1.8 MW CHP generation
• 1.800 MW CHP generation
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (16 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Overton Mill, Basingstoke, Hampshire RG25 3JG (4 components)

6MW Gas Turbine

Inactive • 2021-22 (T-1), 2020-21 (T-1)
Port Talbot, Port Talbot Works, SA13 2NG (10 components)
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
• Site based CHP - note the primary fuel are Waste Gases
• Site based auto-generation unit ( classified as reciprocating engine for EMR purposes given a Rule Change in 2018 )
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
19.08 MW
Solenis UK Industries Limited, Cleckheaton Road, Low Moor, Bradford, West Yorkshire, BD12 0JZ (8 components)
• CHP Tornado SGT-200 6.4MWh
• CHP Typhoon SGT-100 4.7MWh
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Speke Operations, Fleming Rd, Liverpool L24 9LN (7 components)
• 2 x gas turbines with a total rated gross power capacity of 6.830 MW and total net power capacity of 6.807
• Speke combined heat and power plant.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 19 locations