Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

8 unique locations (161 components)

Harmire Road, Barnard Castle, County Durham, DL12 8D (15 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.35 MW
North Avenue, Marston Green, Birmingham, B40 1NT (26 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Active • 2024-25 (T-4), 2023-24 (T-4) ...
5.83 MW
6.35 MW
Loading map...
Showing 8 locations