Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

40 unique locations (594 components) - Page 1 of 2

1345 Govan Rd., Glasgow, G51 4TF (6 components)

CHPs at Queen Elizabeth Hospital

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.16 MW
1345 Govan Rd, Glasgow Metropolitan Area G51 4TF (5 components)
• 3 x 1.2MW gas CHP in a hospital environment.
• 3 x 1.2MW gas CHP with 2.2MW excess (only two run at any time)
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
Avlon Works, Severn Road, Hallen Bristol, BS10 7ZE, United Kingdom (5 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 2.758 MW.
• CHP plant.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
1.31 MW
Blackshaw Rd, London SW17 0QT (8 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Boiler House, Central Manchester University Hospital, Oxford Road, Manchester M13 9WL, UK (2 components)

The Prospective Generating Unit will be an Edina TCG 2032B V16 4.5MWe CHP Gas Engine (or similar) situated on Central Manchester University Hospital site.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (6 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (49 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.28 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (27 components)
• Gas Engine
• Gas engine
• Gas turbine generator
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
7.28 MW
Engie Great Coates, Grimsby, DN31 2TT (28 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Engie Great Coates, Grimsby, DN31 2TT (19 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Fellside CHP Sellafield Ltd Seascale Cumbria CA20 1PG UK (5 components)

Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (9 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU (8 components)
• New 4.5MW CHP at Oxford Hospital
• VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.07 MW
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lancaster University, Bailrigg, Lancaster, LA1 4YW (9 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.32 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (47 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.96 MW
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at …
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (21 components)
• The CMU MAIN16 consists of three identical components (JENBA1,2 &3), with each CHP engine delivering 1.845MW (1.942MW design output but …
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Marsh Road, Banks, Southport PR9 8DX (19 components)
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh …
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of …
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations