Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

48 unique locations (703 components) - Page 1 of 2

530 London Road, Croydon CR7 7YE (7 components)

CHP

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Aventine Way, Glebe Farm Industrial Estate, Rugby, CV21 1HA (16 components)

A gas CHP supplying a manufacturing facility

Active • 2027-28 (T-4), 2024-25 (T-4) ...
Burnside Mills, Kendal,Cumbria,LA9 6PZ (8 components)

Gas fired CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.46 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (28 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.32 MW
Church Manorway, Erith DA8 1DL (47 components)

gas-fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.03 MW
Cobden Street, Montrose, Angus, DD10 8EA (12 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (18 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Denmark Hill, Brixton, London, SE5 9RS (10 components)
• CHP unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Easter Bush Energy Centre, Bush Farm Road, Roslin, Midlothian, EH25 9RG (5 components)

Two CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (49 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
7.28 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (49 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Energy Centre, St James's University Hospital, Beckett Street, Leeds, LS9 7TF. (7 components)

4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (22 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Hammersmith Hospital, Du Cane Road, Shepherds Bush, London, W12 0HS (7 components)

A gas turbine CHP, providing steam and electricity to Hammersmith Hospital

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (9 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Haxby Rd, York, YO91 1XY (14 components)
• CHP Unit
• Gas fired CHP unit
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (18 components)
• Centrax gas turbine CHP
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
King's Buildings, West Mains Road, Edinburgh, EH9 3JG (11 components)

One CHP, generating for site load which exceeds generating capacity. No aux load.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lhoist UK Ltd Hindlow Buxton SK17 0EL (16 components)
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
• GE Jenbacher JMS612GS-NL containerised gas engine generating set rated at 2.004MW, providing heat and electricity. Engine will be based at a lime quarry with majority of power and heat used on site, although a 2000kVA export connection will also be in place to allow engine to run at full load at all times.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
London Rd, Purfleet RM19 1SD (22 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.61 MW
Loading map...
Showing 25 locations