Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

13 unique locations (780 components)

University of Warwick, Coventry, CV4 7AL (81 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
20.78 MW
T&L Sugars Limited, Thames Refinery, Factory Road, Silvertown, London, United Kingdom, E16 2EW (56 components)
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
52.83 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (43 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
23.13 MW
Smurfit Kappa Townsend Hook, Mill Street, Snodland, Kent, ME6 5AX (11 components)
• 5.2MWe CHP gas turbine
• GT2 CHP unit rated at 5.2MW
Inactive • 2022-23 (T-4), 2019-20 (T-1)
Seal Sands, Middlesbrough, TS2 1UB (35 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Seal Sands, Middlesborough, TS2 1UB (35 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
6.48 MW
Port Causeway Bromborough Merseyside CH62 4TH (39 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
16.14 MW
London Rd, Purfleet RM19 1SD (35 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
29.12 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (86 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2025-26 (T-1), 2025-26 (T-4) ...
98.70 MW
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (35 components)
• Centrax gas turbine CHP
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Energy Center, Ashton Street, Liverpool, L69 3GB (87 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
18.40 MW
Church Manorway, Erith DA8 1DL (82 components)

gas-fired CHP unit

Active • 2025-26 (T-4), 2024-25 (T-1) ...
50.35 MW
1 Thane Road West, Nottingham, NG2 3AA (155 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
101.02 MW
Loading map...
Showing 13 locations