Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

72 unique locations (987 components) - Page 1 of 3

1345 Govan Rd., Glasgow, G51 4TF (6 components)

CHPs at Queen Elizabeth Hospital

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.16 MW
1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (17 components)

CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.81 MW
2 Engineers Way, Wembley, Middlesex, HA9 0JS (7 components)

Energy Centre with 2 x1.5MW gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
2.75 MW
2 Samworth Way, Melton Mowbray LE13 1GA (6 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.00 MW
530 London Road, Croydon, CR7 7YE (6 components)

Gas fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
1.41 MW
66 Molesworth Street, London SE13 7EY (14 components)
• CHP plant
• Gas fired CHP unit
Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.08 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (7 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.00 MW
Bar Ln, Boroughbridge, Roecliffe, York YO51 9NN (4 components)

on site generating CMU

Active • 2027-28 (T-4), 2024-25 (T-1) ...
1.80 MW
1.31 MW
13.74 MW
23.15 MW
Burnside Mills, Kendal,Cumbria,LA9 6PZ (8 components)

Gas fired CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.46 MW
Church Manorway, Erith DA8 1DL (47 components)

gas-fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.03 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (10 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.01 MW
Drakemyre, Dalry KA24 5JJ (24 components)

Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas (3)

Active • 2028-29 (T-4), 2026-27 (T-4) ...
12.45 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (21 components)
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Active • 2025-26 (T-4), 2024-25 (T-4) ...
67.23 MW
Energy Centre, Lower Mosley Street, Manchester M2 3GX (9 components)

A 3.36MW gas fired reciprocating engine CHP.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
5.97 MW
Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX (8 components)
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
Active • 2024-25 (T-4), 2023-24 (T-1) ...
6.03 MW
Engie Great Coates, Grimsby, DN31 2TT (28 components)

Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Engie Great Coates, Grimsby, DN31 2TT (19 components)
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the participating generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.943 MW as per the 3 highest export peaks.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.05 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (16 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2025-26 (T-4) ...
2.50 MW
Hugden Way, Malton YO17 9HG (5 components)
• On-site Generating Unit.
• on site generating cmu
Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.18 MW
Loading map...
Showing 25 locations