Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

12 unique locations (111 components)

2 Samworth Way, Melton Mowbray LE13 1GA (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
13.34 MW
Aspatria Creamery/Station Rd, Wigton CA7 2AR (13 components)

Existing Generation on existing site - CHP

Active • 2023-24 (T-1), 2024-25 (T-1) ...
10.41 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (6 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.39 MW
Chryston, Moodiesburn, Glasgow G69 0JE (9 components)

On-site Generating CMU.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
9.85 MW
Hugden Way, Malton YO17 9HG (12 components)
• On-site Generating Unit.
• on site generating cmu
Active • 2023-24 (T-1), 2024-25 (T-1) ...
32.03 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (6 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
22.58 MW
30.62 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (7 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
18.67 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (9 components)

On-site Generating CMU.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
66.35 MW
19.34 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (12 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
153.69 MW
Young's House, Wickham Road, Grimsby DN32 8HW (12 components)
• On-site Generating CMU
• on site generating CMU
Active • 2023-24 (T-1), 2024-25 (T-1) ...
30.13 MW
Loading map...
Showing 12 locations