Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

20 unique locations (264 components)

1.31 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (28 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.32 MW
Cobden Street, Montrose, Angus, DD10 8EA (12 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Darent Valley Hospital, Darenth Wood Rd, Dartford, DA2 8DA (9 components)

1280 KWe Combined Heat and Power unit.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
1.15 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (10 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
21.01 MW
Denison Road, Selby, North Yorkshire YO8 8AN (18 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.51 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (22 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (9 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (20 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
0.91 MW
North Avenue, Marston Green, Birmingham, B40 1NT (16 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Park Road, Ware. Hertfordshire, SG12 0DP (25 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Priory Street, Ware, Hertfordshire, SG12 0DJ (13 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (16 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
0.91 MW
0.90 MW
Loading map...
Showing 20 locations