Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

25 unique locations (439 components)

24-25 Eastern Way, Bury St Edmunds, IP32 7AD (17 components)

CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.81 MW
Cargill PLC, Trafford Park, M17 1PA (20 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.35 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (57 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.66 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (49 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Lancaster University, Bailrigg, Lancaster, LA1 4YW (9 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.32 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (14 components)

CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.55 MW
London Rd, Purfleet RM19 1SD (22 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.61 MW
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (6 components)

CHP unit - 1 x 2,000kw

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.42 MW
Oldfield Ln, Matlock DE4 2LP (2 components)

Gas engine

Active • 2024-25 (T-4), 2023-24 (T-4)
Pontefract Rd, Leeds, LS10 1AX (21 components)

CHP unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
4.00 MW
Port Causeway Bromborough Merseyside CH62 4TH (21 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
8.07 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (29 components)

CHP unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
5.41 MW
Station Road, Wigton, Cumbria CA7 9BG (37 components)
• Back pressure steam turbine
• Gas engine
• Gas turbine
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.35 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (22 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
7.60 MW
University of Warwick, Coventry, CV4 7AL (59 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 25 locations