Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

73 unique locations (1492 components) - Page 1 of 3

Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
232.80 MW
Westexe, Tiverton, Devon, EX16 5LL (11 components)

2026 kW CHP unit

Active • 2026-27 (T-4), 2025-26 (T-4) ...
7.31 MW
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (13 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
63.45 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (5 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.95 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.73 MW
7.18 MW
3.64 MW
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Active • 2026-27 (T-4), 2025-26 (T-4) ...
15.24 MW
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (20 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2028-29 (T-4), 2026-27 (T-4) ...
8.29 MW
The Ridgeway Enfield, Middlesex EN2 8JL (16 components)

On-site CHP - existing generating unit The Ridgeway Enfield, Middlesex EN2 8JL OS Grid Reference: TQ 312 980

Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.05 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.33 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (13 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.69 MW
Staithes Road, Preston, Hull, HU12 8TB (44 components)
• CHP Unit Located at Staithes Road, Preston, Hull, HU12 8TB
• Gas fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.83 MW
Stainland Boardmill, Holywell Green, Halifax, HX4 9PY (5 components)

Gas Fired CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
12.67 MW
SOUTH STAFFORDSHIRE WATER PLC, Hampton Loade Treatment Works, Hampton Loade, Bridgnorth, WV15 6HD (24 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
48.51 MW
Solvay, Trinity St, Oldbury, B69 4LW (14 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
11.32 MW
School Road, Aberdeen AB24 1TU (25 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
8.70 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (26 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.61 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (23 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (18 components)

Energy from Waste Recovery Facility

Active • 2028-29 (T-4), 2026-27 (T-4) ...
201.60 MW
Rocks Dryer, Rosvear Road, Bugle, St. Austell, PL26 8PJ (17 components)
• Gas CHP
• Gas CHP in St. Austell
Active • 2026-27 (T-4), 2024-25 (T-4) ...
13.37 MW
Power Station Road Isle of Grain Rochester ME3 0AR (82 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5014.90 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (24 components)

Poole Existing Site CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
16.83 MW
Loading map...
Showing 25 locations