Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

49 unique locations (353 components) - Page 1 of 2

Active MW: 39912.66 MW
Inactive MW: 1392.68 MW
3 Fountain Drive, Inchinnan Business Park, Paisley, PA4 9RF. (5 components)

MTU - 8V400064 1.013MW

Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.17 MW
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (3 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
4.49 MW
Barrack Road, Exeter, EX2 5DW. (5 components)

1.521 MW CHP unit

Active • 2026-27 (T-4), 2024-25 (T-4) ...
6.52 MW
Blackshaw Rd, London SW17 0QT (5 components)

CHP on a hospital site

CHP and autogeneration Combined Heat and Power (CHP) DISTRIBUTED ENERGY CUSTOMER SOLUTIONS LIMITED New Build Generating CMU St George's CHP Units St George's CHP Units +1 more SW17
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
14.16 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW. (5 components)

CHP Engine 3.360MW

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.20 MW
Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (8 components)

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.23 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (22 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
102.71 MW
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (3 components)

Turbo Expander - for pressure reduction of incoming natural gas

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
5.41 MW
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (3 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
4.49 MW
Cleckheatone Road, Lowmoore, Bradford, BD12 0JZ (1 component)

Gas Turbine CHP (typhoon) SGT-100 rated 4.9MWe BABR-1_2

Inactive • 2019-20 (T-1)
4.41 MW
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (7 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
66.03 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (7 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST03 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
60.33 MW
Cobden Street, Montrose, Angus, DD10 8EA (9 components)

On-site existing CHP generating unit

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1B-MT Glaxo Barnard Montrose Ware & Worthing +2 more DD10
Active • 2024-25 (T-4), 2023-24 (T-4) ...
17.16 MW
6.60 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (6 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
35.45 MW
Denison Road, Selby, North Yorkshire YO8 8AN (6 components)
• One 8 MWe Gas Turbine Cogeneration Unit (GT2) (2)
• Gas Turbine Cogeneration Unit
Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Denison Road, Selby, North Yorkshire, YO8 8AN (13 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
59.24 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (33 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST07 EA 17/18 REST08 +14 more DN40
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
305.66 MW
Edgabaston, Birmingham, West Midlands, B15 2TT (18 components)
• Gas Engine
• Gas engine
• Gas turbine generator
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST01 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more B15
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
76.59 MW
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (18 components)

On-site existing CHP generating unit (3)

CHP and autogeneration Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES2A-ST Glaxo R&D Stevenage, Ware +2 more SG1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (7 components)

On-site existing CHP generating unit

Combined Heat and Power (CHP) CENTRICA BUSINESS SOLUTIONS UK OPTIMISATION LIMITED Existing Generating CMU 6RES1A-BC Glaxo Barnard Montrose Ware & Worthing
Active • 2024-25 (T-4), 2023-24 (T-4) ...
8.43 MW
Loading map...
Showing 25 locations