Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

39 unique locations (704 components) - Page 1 of 2

Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL (11 components)

Gas Turbine CHP GT001A

Active • 2026-27 (T-4), 2023-24 (T-4) ...
5.88 MW
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (38 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2023-24 (T-4) ...
21.21 MW
Cleckheatone Road, Lowmoore, Bradford, BD12 0JZ (3 components)

Gas Turbine CHP (typhoon) SGT-100 rated 4.9MWe BABR-1_2

Inactive • 2019-20 (T-1)
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (15 components)
• Diesel Reciprocating Generator, rated 1MWe nominal
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2
• Gas turbine generator 6.4MWe CHP BABR-1
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (17 components)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
• Steam Turbine
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
7.28 MW
Denison road, Selby, North Yorkshire, YO8 8AN. (14 components)

Gas Turbine Cogeneration Unit GT3

Active • 2026-27 (T-4), 2025-26 (T-4) ...
65.83 MW
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2024-25 (T-4) ...
7.51 MW
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (79 components)
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• TLOR-1 1 ea 38MWe Cogeneration Unit 9G1
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
7.28 MW
Harmire Road, Barnard Castle, County Durham, DL12 8D (15 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
6.35 MW
Moorcroft Drive Wednesbury WS10 7DE (13 components)

EnerG 1000 CHP

Active • 2026-27 (T-4), 2025-26 (T-4) ...
6.35 MW
Loading map...
Showing 25 locations