Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

47 unique locations (760 components) - Page 1 of 2

1 Midland Road, London, NW1 1AT (2 components)

One GE Genbacher 612GS 2MWe CHP

Inactive • 2019-20 (T-1)
1 Midland Road, London, NW1 IAT (2 components)

One GE Genbacher 612GS 2MWe CHP engine and one Caterpillar C175-16 ACERT 2.4MWe diesel backup generator

Inactive • 2019-20 (T-1)
1 Thane Road West, Nottingham, NG2 3AA (73 components)
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
21.44 MW
24-25 Eastern Way, Bury St Edmunds, IP32 7AD (17 components)

CHP Unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.81 MW
Cargill PLC, Trafford Park, M17 1PA (20 components)

Siemens SGT200 Based CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.35 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (57 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.66 MW
Church Manorway, Erith DA8 1DL (47 components)

gas-fired CHP unit

Active • 2024-25 (T-1), 2023-24 (T-1) ...
5.03 MW
Energy Center, Ashton Street, Liverpool, L69 3GB (49 components)
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Active • 2024-25 (T-4), 2023-24 (T-4) ...
JDE, Ruscote Avenue, Banbury, Oxfordshire, OX16 2QU (18 components)
• Centrax gas turbine CHP
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lancaster University, Bailrigg, Lancaster, LA1 4YW (9 components)

Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.32 MW
Laporte Road, Stallingborough, North East Lincolnshire, DN40 2PR (47 components)
• 2.8MWe back pressure steam turbine
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Active • 2024-25 (T-1), 2023-24 (T-1) ...
10.96 MW
Lockerbie Creamery, Lockerbie, England. DG11 1LW (14 components)

CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
2.55 MW
London Rd, Purfleet RM19 1SD (22 components)

Gas-fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
14.61 MW
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (6 components)

CHP unit - 1 x 2,000kw

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.42 MW
Loading map...
Showing 25 locations