Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

346 unique locations (3777 components) - Page 11 of 14

Royal Devon & Exeter Hospital (Wonford) (Unit 3112), Barrack Road, Exeter, Devon, EX2 5DW (1 component)

1 x Gas reciprocating engine with a total rated gross power capacity of 1.521 MW and net power output of 1.487MW

Active • 2028-29 (T-4)
1.34 MW
Royal Liverpool University Hospital, Prescott Street, Liverpool L7 8XP (13 components)
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.241 MW and total net power capacity of 5.050 MW.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.300 MW and a net power capacity of 5.109 MW after taking into account generator auxiliary load.
• 2 x Gas reciprocating engines with a total rated gross power capacity of 5.362 MW and total net power capacity of 5.290 MW.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.78 MW
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (14 components)

0.725MW Combined Heat and Power Plant Royal South Hants Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.73 MW
2.11 MW
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (10 components)

Two gas CHP in a horticultural environment with no aux load

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Runnings Road, Cheltenham, Gloucestershire, GL51 9NQ (2 components)

A gas engine CHP site providing steam and electricity to an industrial unit

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Runnings Road, Swindon Village, Cheltenham, GL51 9NQ (9 components)

A gas engine CHP site providing steam and electricity to an industrial unit

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Rydings lane, North Meols, West Lancashire, Lancashire, PR9 8EB (4 components)

A gas fuelled Combined heat and Power plant (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
12.24 MW
Saddlebow Industrial Estate, Poplar Avenue, Kings Lynn, Norfolk, PE34 3AL (2 components)
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated anciliary plant and buildings.
• The CMU comprises one Gas Turbine generator, one HRSG boiler, one Back Pressure Steam Turbine generator and associated ancillary plant and buildings.
Active • 2028-29 (T-4), 2021-22 (T-4)
42.50 MW
Saddlebow Industrial Estate, Poplar Avenue, King's Lynn PE34 3AL. (16 components)
• Power Station for Paper plant made up of 1x35MW Gas engine
• Power Station for Paper plant made up of 1x35MW Gas engine plus 1x12MW steam turbine
Active • 2026-27 (T-4), 2025-26 (T-4) ...
41.29 MW
Sallow Rd, Weldon Ind Est, Corby Northants, NN17 5JX (9 components)

The component corresponds to two gas turbines embedded into a CHP located on an industrial plant. The two turbine export electricity onto the site's private network.

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Saltend Power Station Saltend Hull HU12 8GA (36 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
19398.68 MW
Samian Way, Aston, Clinton ,Aylesbury, England, HP22 5EZ (29 components)

CHP unit

Active • 2025-26 (T-1), 2024-25 (T-4) ...
5.41 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (14 components)

Callington - Existing Site CHP unit

Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.40 MW
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (11 components)
• Gas CHP in horticultural environment providing heat & electricity for crop growth
• One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1.04 MW
School Road, Aberdeen AB24 1TU (18 components)
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas
• District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.73 MW
Seal Sands, Middlesborough, TS2 1UB (20 components)

One of four SURF (Aggreko) model CHP units rated at 1375kVA

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Seal Sands, Middlesbrough, TS2 1UB (20 components)
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (23 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23S11 is a Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT and Steam Turbine in CHP Configuration within the (former ICI) Wilton Site.
• S23G03 will be a OCGT in CHP Configuration within the (former ICI) Wilton Site. CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.48 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S21G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.65 MW
Shottentons Farm, Pecks Hill, Nazeing, Essex, EN9 2NY (11 components)

Gas fuelled CHP generation plant

Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.58 MW
Slough Nurseries, Rochford Gardens, Uxbridge Road, Slough SL2 5NU (4 components)

One 2MW gas CHP engine in a horticultural environment

Active • 2027-28 (T-4), 2024-25 (T-1) ...
1.78 MW
Loading map...
Showing 25 locations