Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

346 unique locations (3777 components) - Page 14 of 14

0.90 MW
University of Warwick, Coventry, CV4 7AL (59 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (13 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.14 MW
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (6 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2028-29 (T-4), 2027-28 (T-4) ...
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (8 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
9.09 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (14 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.91 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (1 component)

New-Build CHP Generating Unit at Berry Wicks Farm.

Active • 2028-29 (T-4)
1.26 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (6 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Winnington CHP Winnington Lane Winnington Northwich Cheshire (1 component)

Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.

Active • 2027-28 (T-4)
14.23 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (37 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (2)
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2921.10 MW
41.84 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (19 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
• One 2MW gas CHP engine in a horticultural environment
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.18 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.08 MW
Young's House, Wickham Road, Grimsby DN32 8HW (5 components)
• On-site Generating CMU
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
1.36 MW
Loading map...
Showing 21 locations