Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

346 unique locations (3777 components) - Page 9 of 14

Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (3 components)

On-Site Generating CMU

Active • 2028-29 (T-4), 2025-26 (T-1) ...
2.53 MW
4.18 MW
4.09 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (10 components)

A gas engine CHP site providing hot water to a local district heating network (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (17 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (2)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.53 MW
NEWLINCS Integrated Waste Management Facility. South Marsh Road, Stallingborough, NE Lincs, DN41 8BZ (4 components)

The component corresponds to one gas turbines embedded into a CHP located on an industrial plant. The turbine exports electricity onto the site's private network.

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Newton Aycliffe CO Durham DL5 6EA (38 components)
• This is a long standing existing CHP unit located on land within a manufacturing site.
• This is an existing CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.22 MW
Ninewells Hospital, Dundee, DD2 1UB (9 components)
• A Packaged 3.976MW, 11kV CHP
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
Active • 2025-26 (T-4), 2024-25 (T-4) ...
North Avenue, Marston Green, Birmingham, B40 1NT (16 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
• Proposed Gas Generation units at 1013kWe
Active • 2024-25 (T-4), 2023-24 (T-4) ...
North Devon District Hospital, North Rd, Barnstaple, EX31 4JB (3 components)

1 x Gas reciprocating engine with a total rated gross power capacity of 0.801 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
North Lonsdale Road, Cumbria, Ulverston, LA12 9DR (16 components)

On-site existing CHP generating unit

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Northmoor Lane, Cottingham, Hull HU16 4JN (7 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.73 MW
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (19 components)
• CHP at a horticultural environment.
• CHP at horticultural site
• Gas CHP engines in commercial horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3.62 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
11.21 MW
Oakthorpe Dairy, Chequers Way, Palmers Green, London, England, N13 6DA (6 components)

CHP unit - 1 x 2,000kw

Active • 2024-25 (T-4), 2023-24 (T-1) ...
3.42 MW
Oldfield Ln, Matlock DE4 2LP (2 components)

Gas engine

Active • 2024-25 (T-4), 2023-24 (T-4)
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (5 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• Gas reciprocating engine
Active • 2028-29 (T-4), 2025-26 (T-1) ...
0.73 MW
Ormskirk & District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (3 components)

1 x Gas reciprocating engines with a total rated gross power capacity of 1.077 MW

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Ottringham Road Keyingham Hull North Humberside HU12 9RX (8 components)
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Overton Mill, Basingstoke, Hampshire RG25 3JG (4 components)

6MW Gas Turbine

Inactive • 2021-22 (T-1), 2020-21 (T-1)
Par CHP, Par Docks, Par, St. Austell, PL24 2BN (12 components)
• CHP unit
• Gas CHP located in St. Austell
Active • 2026-27 (T-4), 2025-26 (T-4) ...
3.65 MW
Par Docks, Par, Cornwall PL24 2SQ (18 components)
• One 3.7 MWe gas fired CHP (Centrax KB5)
• Two 3.7 MWe gas fired CHP
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
1.68 MW
Park Road, Ware. Hertfordshire, SG12 0DP (25 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Pelham Drive, Bootle, Merseyside, L30 4XN (2 components)

CHP plant

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (7 components)

Existing Generation on existing site - CHP

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.00 MW
Loading map...
Showing 25 locations