Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

6 unique locations (20 components)

Active MW: 17008.53 MW
Inactive MW: 492.25 MW
Melton Ross Quarries Barnetby, North Lincolnshire, DN38 6AE (2 components)
• 0.8 MWe Gas Powered Generation Unit
• 0.8 MWe Gas powered generator
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cleckheaton Road, Lowmoore, Bradford, BD12 0JZ (5 components)
• Steam Turbine (2)
• Gas Turbine Generator CHP (typhoon) SGT-100 rated 4,9 MWe BABR-1_2
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST03 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Cleckheaton Road, Lowmoor, Bradford, BD12 0JZ (5 components)
• Diesel Reciprocating Generator, rated 1MWe nominal BABR-2 (2)
• Gas turbine generator 6.4MWe CHP BABR-1
CHP and autogeneration Combined Heat and Power (CHP) Centrica Business Solutions UK Optimisation Limite Existing Generating CMU EA 17/18 REST02 GEN1(DSSMITH_BASF_UOB_TLOR2 8G4) +2 more BD12
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Clatterbridge Road, Bebington, Birkenhead, Wirral CH63 4JY (3 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Cats Terminal, Seal Sands Rd, Middlesbrough, Cleveland, TS2 1UB (2 components)

Turbo Expander - for pressure reduction of incoming natural gas (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Arrowe Park Road, Upton, Birkenhead, Wirral CH49 5PE (3 components)

On-site existing CHP generating unit (3)

Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Loading map...
Showing 6 locations