Combined Heat and Power (CHP)

24 unique locations (498 components)

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
9.05 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
232.80 MW
The Old Airfield, City Fields Way, Tangmere, Chichester West Sussex PO20 2FT (24 components)
• Four CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three CHP engines in a horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations.
• Three engines of 2.65MW each all CHP engine in a horticultural environment, exporting excess generation to distribution network. Primary fuel type = Natural Gas
Active • 2022-23 (T-4), 2023-24 (T-4) ...
6.37 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (11 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2021-22 (T-4), 2022-23 (T-3) ...
11.64 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
24.33 MW
St Andrews CHP, Devons Road, Bromley by Bow, London, E3 3BF (13 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.69 MW
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
116.23 MW
Saltend Power Station Saltend Hull HU12 8GA (34 components)
• Unit 1 at Saltend Power Station
• Unit 2 at Saltend Power Station
• Unit 3 at Saltend Power Station
Active • 2022-23 (T-4), 2023-24 (T-4) ...
3486.78 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2022-23 (T-3), 2022-23 (T-4) ...
1165.32 MW
Plot 6 Barrow Man Road, Birchington CT7 0AX (22 components)

CHP engine in a horticultural environment, natural gas, no aux load

Active • 2022-23 (T-4), 2023-24 (T-4) ...
14.72 MW
Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX (11 components)

Two CHP gas engines in commercial horticultural environment with no auxilliary load

Active • 2022-23 (T-4), 2023-24 (T-4) ...
18.05 MW
Plot 3, Barrow Man Road, Birchington CT7 0AX (22 components)

Gas CHP in a horticultural environment providing heat & electricity to site and exporting excess.

Active • 2022-23 (T-4), 2023-24 (T-4) ...
17.46 MW
Myatts Field CHP, Akerman Road, Lambeth, London, SW9 6SN (11 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2022-23 (T-4), 2023-24 (T-4) ...
0.74 MW
Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH (7 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2024-25 (T-4) ...
19.04 MW
Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP (10 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2022-23 (T-4), 2023-24 (T-4) ...
0.75 MW
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (17 components)
• CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
• New CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
6.84 MW
Galley Hill Road Waltham Abbey Essex EN9 2AG (25 components)
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Active • 2023-24 (T-1), 2023-24 (T-4) ...
8.90 MW
Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom (8 components)
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG-19, EMD-19 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02). Gross 3 HH av. peak generation from Unit 5 on separate days = 141.040 MW At these three HH times, aux load on Unit 5 = 2.597 MW Net generation from Unit 5 = 138.443 MW
• Unit 5 is a Cogenation unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, EPCO1. All Components of EMG-18, EMD-U3 and EMD-T1 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power and steam generation units on site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment- the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. Gross 3 HH av. peak generation from Unit 5 on separate days = 139.707 MW At these three HH times, aux load on Unit 5 = 2.517 MW Net generation from Unit 5 = 137.190 MW
• Unit 5 is a Cogeneration unit which produces both steam and power. Unit 5 is the largest generating unit at Fawley refinery. This Generating Unit forms the 'E_FAWN-1' BMU on its own and is part of the larger site inclusive BM Trading Unit, 'EPCO1'. All Components of EMG244 are located within the physical boundaries of the Esso Petroleum Company,Limited, Oil Refinery at Esso Refinery - Fawley - Southampton - Hampshire - SO45 1TX - United Kingdom. Unit 5 is one of three power generation units on the site and is a Gas Turbine CHP plant. It is connected to the Local Distribution Network (LDN) at 132kV level at the Fawley North Sub-Station (MSID 7081). Unit 5 is a licensed generator. Unit 5 has various auxiliary load equipment, the power for which is supplied from another part of the LDN Fawley North Sub-Station. This auxiliary power has half hourly meters installed. The two auxiliary meters have the IDs: R98HAN757 (aka S36A-VFH-TR01) and R98HAN758 (aka S36A-VFH-TR02).
Active • 2023-24 (T-4), 2024-25 (T-4) ...
382.93 MW
Cargill PLC, Trafford Park, Manchester, M17 1PA (80 components)
• Siemens SGT200 based CHP
• Solar T70 Based CHP System
• Solar T70 based CHP system
Active • 2022-23 (T-4), 2023-24 (T-4) ...
93.80 MW
Cargill PLC, Trafford Park, M17 1PA (30 components)

Siemens SGT200 Based CHP

Active • 2022-23 (T-3), 2022-23 (T-4) ...
94.67 MW
267.94 MW
Bath CHP, Midland Road, Bath, BA2 3EW (14 components)

A gas engine CHP site providing hot water to a local district heating network

Active • 2023-24 (T-4), 2025-26 (T-4) ...
0.72 MW
Barrow Man Road Birchington Kent CT7 0AX (14 components)
• Two CHP engines in horticultural environment with no auxilliary load
• Two 2.7MW CHP engines. Primary fuel type = Natural Gas
Active • 2022-23 (T-4), 2023-24 (T-4) ...
9.46 MW
Academy CHP, Lodge Avenue, Academy Way, Dagenham, London, RM8 2JA (12 components)
• A as engine CHP site providing hot water to a local district heating network
• A gas engine CHP site providing hot water to a local district heating network
Active • 2023-24 (T-4), 2024-25 (T-4) ...
1.20 MW
Loading map...
Showing 24 locations