Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

36 unique locations (644 components) - Page 1 of 2

Young's House, Wickham Road, Grimsby DN32 8HW (12 components)
• On-site Generating CMU
• on site generating CMU
Active • 2023-24 (T-1), 2024-25 (T-1) ...
30.13 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2024-25 (T-1), 2024-25 (T-4) ...
9.85 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
14.73 MW
TOTAL LINDSEY OIL REFINERY LTD, EASTFIELD ROAD, NORTH KILLINGHOLME, IMMINGHAM, DN40 3LW (12 components)
• On-Site Generating CMU.
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
• On-Site Generating Steam Turbine, utilising high pressure steam waste from on-site refinery processes as a 'fuel input' and generating electricity w/o fossil fuel emissions.
Active • 2024-25 (T-1), 2024-25 (T-4) ...
153.69 MW
19.34 MW
Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN (2 components)

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW

Active • 2025-26 (T-1), 2028-29 (T-4)
1.73 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (9 components)

On-site Generating CMU.

Active • 2024-25 (T-1), 2025-26 (T-1) ...
66.35 MW
Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ (6 components)
• 1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW
• Gas reciprocating engine
Active • 2018-19 (T-1), 2021-22 (T-4) ...
1.46 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (7 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
18.67 MW
Northmoor Lane, Cottingham, Hull HU16 4JN (10 components)

one CHP (1.9MW rating) in a horticulatural environment with no aux load

Active • 2023-24 (T-1), 2024-25 (T-1) ...
13.87 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (25 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
Active • 2024-25 (T-1), 2025-26 (T-1) ...
7.80 MW
30.62 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (24 components)

Nantwich Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
13.78 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (34 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Active • 2025-26 (T-1), 2025-26 (T-4) ...
230.55 MW
Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS (6 components)

On-Site Generating CMU

Active • 2025-26 (T-1), 2028-29 (T-4)
4.36 MW
Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN (4 components)

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW

Active • 2025-26 (T-1), 2028-29 (T-4)
14.21 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (6 components)

On-Site Generating CMU

Active • 2024-25 (T-1), 2025-26 (T-1) ...
22.58 MW
15.93 MW
11.21 MW
Hugden Way, Malton YO17 9HG (12 components)
• On-site Generating Unit.
• on site generating cmu
Active • 2023-24 (T-1), 2024-25 (T-1) ...
32.03 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (24 components)

Hamms Hall - Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
15.64 MW
Hallsville Quarter District Heat Network, Rathbone Street, London, E16 1GU (2 components)

1 x 1.2 MW Gas CHP engine, for the sole purpose of generating electricity for grid export.

Active • 2025-26 (T-1), 2028-29 (T-4)
2.18 MW
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (53 components)
• Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW
• Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW
Active • 2024-25 (T-4), 2025-26 (T-1) ...
12.25 MW
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (47 components)
• 1.2 MW Combined Heat and Power Engine.
• 1.6 MW Combined Heat and Power Engine
• 3MW Diesel Generators at Excel Exhibition Energy Centre London
Active • 2024-25 (T-1), 2025-26 (T-1) ...
15.82 MW
Loading map...
Showing 25 locations