Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

14 unique locations (1064 components)

TW18 (54 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.31 MW
RG40 (135 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
228.75 MW
NP25 (55 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
49.72 MW
NN12 (113 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
56.84 MW
NG11 (73 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
111.18 MW
Lyndon Avenue Sidcup Kent DA15 (3 components)
• Domestic EV charger
• Energy from waste facility located in Staffordshire - Postcode WV10 7DF. This plant was commissionned at the beginning of 2014. It is a municipal waste incineration plant. It is based on two boilers supplying steam to one turbine-generator. Exhaust steam is condensed in a Air cooled condenser. The site normally operates at baseload. The auxiliary load is self supplied by the generator prior to export metering. The power factor used is 0.85 for this CMU. Enterprise Drive, Coven, Wolverhampton, Staffordshire WV10 7DY, UK SJ923084
• Gas turbine
Active • 2025-26 (T-4), 2019-20 (T-4) ...
4.48 MW
LS16 (132 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
213.70 MW
HX7 (18 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
57.44 MW
HU12 (44 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
67.86 MW
DN11 (65 components)
• Domestic EV
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
74.16 MW
DE65 (129 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
100.78 MW
DE13 (133 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
182.05 MW
CW4 (69 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
76.07 MW
CT2 (41 components)
• Domestic EV
• Domestic EV charge point
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
109.88 MW
Loading map...
Showing 14 locations