Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

28 unique locations (178 components) - Page 1 of 2

Active MW: 17008.53 MW
Inactive MW: 492.25 MW
Young's House, Wickham Road, Grimsby DN32 8HW (4 components)
• On-site Generating CMU (2)
• on site generating CMU
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.22 MW
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (2 components)

New-Build CHP Generating Unit at Berry Wicks Farm. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
1.26 MW
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (11 components)

Warrington Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.17 MW
Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.83 MW
Staithes Road, Preston, Hull, HU12 8TB (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.49 MW
Snodland Paper Mill, Mill Street, Snodland, Kent, ME6 5AX (3 components)

On-site Generating CMU. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
28.42 MW
Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA (11 components)

Callington - Existing Site CHP unit (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.27 MW
Poole Sustainable Energy LTD, Sterte Ave, Poole, Dorset, BH15 2AS (11 components)

Poole Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.15 MW
Pembroke Rd, Merlin's Bridge, Haverfordwest SA61 1JN (6 components)

Existing Generation on existing site - CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.67 MW
Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
11.21 MW
Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
12.31 MW
Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
12.55 MW
Muller Milk and Ingredients Market Way, North Petherton, Bridgwater, TA6 6DF (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
7.60 MW
MGH Property Services Limited, Laurels Farm, Hatherton, Nantwich, CW5 7PW (11 components)

Nantwich Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
5.13 MW
Mettis Aerospace Limited, Redditch Works, Windsor Road, Redditch, Worcestershire, B97 6EF (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
7.93 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (15 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383 (3)

Combined Heat and Power (CHP) GRIDBEYOND LIMITED Existing Generating CMU GridBeyond GBD009 LL14
Active • 2028-29 (T-4), 2027-28 (T-4) ...
137.79 MW
Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.28 MW
Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom (4 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
6.26 MW
Innospec Manufacturing Park, Oil Sites Road Ellesmere Port, Cheshire CH65 4EY (2 components)

On-site Generating CMU. (2)

Active • 2028-29 (T-4), 2025-26 (T-1)
5.61 MW
Hugden Way, Malton YO17 9HG (4 components)
• On-site Generating Unit. (2)
• on site generating cmu
Active • 2028-29 (T-4), 2025-26 (T-1) ...
8.94 MW
Hams Hall Sustainable Energy LTD, Edison Road, Hams Hall Distribution Park, Coleshill, B46 1AL (11 components)

Hamms Hall - Existing Site CHP (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.10 MW
Chryston, Moodiesburn, Glasgow G69 0JE (3 components)

On-site Generating CMU. (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.92 MW
Cashmere Works, Birksland Street, Bradford, West Yorkshire, BD3 9SX (3 components)

On-Site Generating CMU (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
4.07 MW
Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL (1 component)

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

Combined Heat and Power (CHP) GRIDBEYOND LIMITED New Build Generating CMU Not Prequalified LL55
Active • 2028-29 (T-4)
18.19 MW
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)
• existing CHP on site
DSR Combined Heat and Power (CHP) GRIDBEYOND LIMITED Proven DSR CMU Endeco Technologies CMU1 DN16
Active • 2028-29 (T-4), 2027-28 (T-4) ...
42.08 MW
Loading map...
Showing 25 locations