Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Combined Heat and Power (CHP)

4 unique locations (35 components)

North Avenue, Marston Green, Birmingham, B40 1NT (26 components)
• CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
• Gas Generation units at 1013kWe
• Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
Inactive •
Belliver Way, Roborough, Plymouth, PL6 7BP (3 components)

2025kW gas engine

Active • 2024-25 (T-1), 2025-26 (T-1) ...
5.54 MW
Belliver Way, Roborough, Plymouth, PL6 7BP (4 components)

2025 KW gas fire engine

Active • 2024-25 (T-1), 2025-26 (T-1) ...
9.25 MW
Loading map...
Showing 4 locations