Combined Heat and Power (CHP)

346 unique locations (5968 components) - Page 1 of 14

Young's House, Wickham Road, Grimsby DN32 8HW (12 components)
• On-site Generating CMU
• on site generating CMU
Active • 2023-24 (T-1), 2024-25 (T-1) ...
30.13 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
9.05 MW
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (24 components)
• 2MW gas CHP engine in a horticultural environment
• One 1.354 MW gas CHP engine in a horticultural environment
• One 1.5 MW gas CHP engine in a horticultural environment
Active • 2024-25 (T-1), 2024-25 (T-4) ...
9.85 MW
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (42 components)
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
• Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator at 0.85 power factor.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
232.80 MW
Wight Salads Arreton Newport Isle of Wight PO30 3AR (11 components)

The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used

Inactive •
Wicks Farm, Ford Lane, Arundel, W. Sussex, BN18 0DF (4 components)

New-Build CHP Generating Unit at Berry Wicks Farm.

Active • 2025-26 (T-4), 2028-29 (T-4)
2.51 MW
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (16 components)
• Gas CHP in a horticultiral environment providing heat for crop growth
• One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.
Inactive •
WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (13 components)

Existing Generation on existing site - CHP (3)

Inactive •
WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH (5 components)

A gas engine CHP site providing hot water to a local district heating network

Inactive •
Warrington Sustainable Energy LTD, Skyline Drive, Warrington, WA5 3TP (24 components)

Warrington Existing Site CHP

Active • 2025-26 (T-1), 2025-26 (T-4) ...
14.73 MW
University of Warwick, Coventry, CV4 7AL (81 components)
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Inactive •
UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF. (9 components)

Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.

Inactive •
Treviscoe Dryer, Little Treviscoe, St. Austell, PL26 7QN (18 components)
• Gas CHP in St. Austell
• Gas fired CHP unit
Inactive •
Tower Nurseries Netherhall Road Roydon Essex CM19 5JP (20 components)
• Gas CHP engines 1.5MW and 1.48MW. Primary fuel type = Natural Gas
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations
Inactive •
Loading map...
Showing 25 locations