Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

110 unique locations (751 components) - Page 1 of 5

Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (7 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Unproven DSR yet to be procured (46 components)

Unproven DSR yet to be procured

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (5 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
TA9 3QG (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA6 3JS (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA5 2AW (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA4 2UN (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 7PE (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA3 6PH (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA24 6PJ (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA23 0YA (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TA15 6UT (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP5 3EU (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SP4 7BE (5 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Southmead Industrial Park, Collett Road, Didcot, Oxon OX11 7PN (6 components)

2 POSGU (1.0MW and 0.6MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
SN15 3QZ (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Portbury, Bristol, BS20 7XS (7 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2021-22 (T-4), 2018-19 (T-1) ...
Poplars, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1 MW of demand reduction
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (5 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties involved.
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Musgrove Park Hospital, Parkfield Drive, Taunton TA1 5DA (7 components)

2 x POSGU (each 1MW)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations