Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

56 unique locations (511 components) - Page 1 of 3

125 Fullarton Drive, Glasgow East Investment Park GLASGOW G32 8FG (8 components)
• Load curtailment via standby generation exporting excess
• Load reduction on-site and standby generation
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
3 Nutmeg Ln, London E14 2AX (8 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
ASDA Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive • 2017-18 (T-1), 2019-20 (T-1) ...
4.28 MW
ASDA Bromborough, Welton Road Croft Business Park, Bromborough, CH62 3QP (11 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
Inactive • 2017-18 (T-1), 2019-20 (T-1) ...
4.28 MW
Asda Chepstow ADC, Newhouse Farm Ind Est, Chepstow, NP16 6UD (11 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
10.21 MW
ASDA Depot Falkirk CDC, New Bankside, Abbots Wynd FK2 7XP (10 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
10.21 MW
Asda Edinburgh, 100 The Jewel, Brunstane, Edinburgh, EH15 3AR (11 components)
• Load curtailment from refridgeration
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
10.21 MW
Asda Northallerton, Brompton Road , Northallerton, DL6 1DT (10 components)
• Load curtailment
• Load curtailment from refridgeration
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2017-18 (T-1), 2020-21 (T-4) ...
4.80 MW
ASDA Store, Armadale Station Station Road, Armadale, EH48 3ZZ (8 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2017-18 (T-1), 2020-21 (T-4) ...
4.80 MW
ASDA Swindon Haydon, Orbital Shopping Park Thamesdown Drive, Swindon, SN25 4YX (12 components)
• Disabling load of refrigeration plant through remote switch.
• Load curtailment
• Load curtailment from refridgeration
Active • 2017-18 (T-1), 2019-20 (T-1) ...
9.08 MW
Asda Worsbrough, Thomas Street , Worsbrough, S705AU (9 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2017-18 (T-1), 2020-21 (T-4) ...
4.80 MW
Bailey Drive Gillingham Business Park Gillingham ME8 0PZ (13 components)

Load reduction

Active • 2017-18 (T-1), 2020-21 (T-4) ...
1.02 MW
Bankside 2 & 3, 90-100 Southwark Street, London, SE1 0SW (9 components)
• Standby generation DRUPS taking site load, non-exporting
• Standby generation DRUPs taking site load. No export
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Bewl Bridge Treatment Works, Bewl Bridge Lane, Lamberhurst, Tunbridge Wells, TN3 8JH (8 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Bletcham Way, Fennylock, Milton Keynes, Bucks MK1 1QA (12 components)

2 x 0.8MW POSGU (standby generation).

Inactive • 2017-18 (T-1), 2018-19 (T-1) ...
Broom Road, Stone ST15 0TE (8 components)
• Load curtailment
• Load reduction
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Cairnton Road, Boyndie, Banffshire, AB45 2LR (10 components)
• Standby diesel generator that reduces site load when generating.
• Standby generation
• Standby generation from a POSGU.
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Carr Industrial Estate, Doncaster, South Yorkshire, DN4 5JJ (12 components)

Three POSGU (1.26MW, 1.0MW, 1.454MW) providing balancing services

Inactive • 2017-18 (T-1), 2018-19 (T-1) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (10 components)
• Load drop.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Combe Park, Bath, BA1 3NG (8 components)
• Standby generation taking site load
• Standby generation x 2
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Cramptons Road Pumping Station, Cramptons Road, Sevenoaks, TN14 5BQ (9 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Crowhurst Bridge, 62 Shrub Lane, Etchingham, TN19 7EB (9 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
Elmer Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (11 components)

Combination of load curtailment and standby generation

Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
entre Bailey Road,Central Park, Rugby CV23 0PD (7 components)
• Load curtailment & standby generation
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (10 components)

Load reduction on site supported by non-exporting standby generation.

Active • 2017-18 (T-1), 2021-22 (T-4) ...
3.22 MW
Loading map...
Showing 25 locations