DSR (Demand Side Response)

528 unique locations (4729 components) - Page 1 of 22

Yeomans Way, Bournemouth, BH8 0BQ (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
0.87 MW
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (10 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
3.31 MW
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
1.59 MW
Wichling Pumping Station, Syndal Bottom, Sittingbourne, ME9 0BL (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
0.58 MW
Weighbridge Road, Shotton, Deeside, CH5 2LL (22 components)

Paper mill industrial site

DSR Rejected CH5
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
16.00 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (16 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
89.66 MW
Unproven DSR yet to be procured (58 components)

Unproven DSR yet to be procured

DSR
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
141.16 MW
Units 1 and 2 - Fen Street, Magna Park, Milton Keynes, MK17 8EW (7 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
0.21 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (18 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
25.10 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
103.95 MW
"Unit 1 Carter Square, Uttoxeter, ST14 8EU" (4 components)

Load curtailment (3)

Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
0.09 MW
Trosley Pumping Station, Ford Lane, West Malling, ME19 5DP (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
0.58 MW
To be Determined (26 components)
• Aggregated Generation - CHP, AD & Hydro
• Aggregated Generation - Diesel
DSR Rejected
Active • 2024-25 (T-4), 2023-24 (T-4) ...
19.55 MW
To be determined (111 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

DSR
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
704.78 MW
To be confirmed (60 components)

To be confirmed

DSR Conditional
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
238.00 MW
The Owlcotes Centre, Varley Street, Pudsey, LS28 6AR (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
0.87 MW
The Mall, Patchway, Bristol, BS34 5QT (3 components)

Import/Export metering with diesel generation at a retail store

Inactive • 2020-21 (T-1), 2017-18 (T-1)
0.87 MW
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (9 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
2.35 MW
Thannington Pumping Station, 11 Homersham, Canterbury CT1 3RL (6 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
1.28 MW
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Aggregation of several flexible industrial loads and permitted on-site generation.
• ... and 1 more unique description
DSR Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
61.33 MW
TA9 3QG (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.57 MW
TA6 3JS (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.57 MW
TA5 2AW (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.57 MW
TA4 2UN (9 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.57 MW
TA3 7PE (10 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
0.57 MW