Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

20 unique locations (396 components)

Barrasford Pumping Station Barrasford Hexham NE46 4AY (3 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2022-23 (T-3), 2019-20 (T-1) ...
Barrasford Pumping Station Barrasford Hexham NE46 4AY (6 components)
• 0.6MW of turn down
• 4MW of DSR
• Turn down component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
BOC Brinsworth, Bawtry Road, Brinsworth, Rotherham, S60 5NT (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Fawley, Cadland Road, Hythe, SO45 3NX (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Margam, Longlands Lane, Port Talbot, SA13 2NS (20 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Middlesbrough, Teessdock Road, Grangetown, TS6 7RT (21 components)
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (21 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production processes. DSR delivered through reduction of import at site boundary, primarily process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
BOC Scunthorpe, Warren Road, Scunthorpe, DN15 6XH (19 components)
• Industrial Gases production processes. DSR delivered through process interruption
• Industrial Gases production site. DSR delivered through reduction of import at site boundary, primarily through process interruption.
• Industrial Gases production site. DSR provided through process interruption.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
Ervin Amasteel 11KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (2 components)
• 0.4MW demand reduction
• Turn down of 11kv connection
Inactive • 2019-20 (T-1), 2017-18 (TR)
Ervin Amasteel 11KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (5 components)
• 0.4MW demand reduction
• Turn down of 11kv connection
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Ervin Amasteel 33KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (2 components)
• 2.6MW of demand reduction
• Turn down CMU
Inactive • 2019-20 (T-1), 2017-18 (TR)
Ervin Amasteel 33KV connection George Henry Road Breat Bridge Tipton West Midlands DY4 7BZ (4 components)
• 2.6MW of demand reduction
• Turn down CMU
Inactive • 2022-23 (T-4), 2019-20 (T-1) ...
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (9 components)

load curtailment at site

Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Hope Works, Hope Valley,, Derbyshire, S33 6RP (20 components)
• "Hope Construction LTD Hope Works, Hope Valley,, Derbyshire, S33 6RP The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity."
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-1), 2023-24 (T-1) ...
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (0 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
ROTHERHAM WORKS POBOX 50 ALDWARKE LANE S60 1DW OS: SK45009500 (0 components)
• Industrial Site comprising multiple electro intensive proceses_ Reduction in Imported Electricity Directly connected but not CMRS CMU ( see business plan)
• Industrial Site comprising multiple electro intensive process Reduction in Imported Electricity Site is directly connected but not CMRS CMU ( see business plan)
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
Soberton, Southampton, S032 2PG (6 components)
• "Portsmouth Water Soberton, Southampton, S032 2PG The CMU Component reduces import demand by turning off equipment and other non-essential loads. It also contains standby generation for emergency purposes that is not used to provide DSR capacity."
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2020-21 (T-1), 2017-18 (TR)
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Aggregation of several flexible industrial loads and permitted on-site generation.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.69 MW
To be confirmed (60 components)

To be confirmed

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
43.44 MW
To be determined (111 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
Loading map...
Showing 20 locations