DSR (Demand Side Response)

206 unique locations (1156 components) - Page 1 of 9

YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (7 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Willows, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (4 components)
• 1000kW/1200kWh Lithium Ion Battery
• 1MW Lithium Ion Battery Storage unit
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (3 components)

Flour & semolina milling business

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
West Carr Lane, Hull HU7 0BS, UK (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unproven DSR yet to be procured (46 components)

Unproven DSR yet to be procured

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, Hampshire, RG24 8QW (3 components)

Gas generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 6, Lime Kilns Business Park, Hinckley, Leicestershire, LE10 3EL (6 components)

Gas generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
To be confirmed - the components of the Unproven DSR CMU are to be determined. (2 components)

Industrial process flexibility delivering demand side response through reduced electricity imports

DSR TATA STEEL UK LIMITED Not Prequalified
Inactive • 2018-19 (T-1)
to be confirmed once the CMU components are known (17 components)

to be confirmed once the CMU components are known

Inactive • 2021-22 (T-4), 2018-19 (T-1)
19.86 MW
To be confirmed once CMU components are known (79 components)

To be confirmed once CMU components are known

DSR E.ON UK PLC Conditional
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
159.26 MW
to be confirmed once CMU components are known (2 components)

to be confirmed once CMU components are known

Inactive • 2018-19 (T-1)
12.95 MW
To be confirmed (41 components)

To be confirmed

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TILCON LTD, STATION YARD, WAKEFIELD ROAD, ACKWORTH, PONTEFRACT, WEST YORKSHIRE, WF7 7DF (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
The Loddon Centre, Basingstoke RG24 8QW, UK (1 component)

We are currently in discussions with a number of DSR Customers, with the aggregate of the customers capacity totalling 50MW. Contracts are currently being written and reviewed between the parties …

Inactive • 2018-19 (T-1)
The Leys, Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 0.8 MW of demand reduction
• 800kW/1100kWh Lithium Ion Battery
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
The Leys Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9RG (3 components)

0.8MW demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
TBC - as this is an unproven DSR CMU we will determine the components from the Tata Steel UK estate. (1 component)

Manufacturing process within the Tata Steel estate ( specific installations to be confirmed )

Inactive • 2018-19 (T-1)
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
TA9 3QG (6 components)

Water treatment centre

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 25 locations