Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

158 unique locations (1246 components) - Page 1 of 7

"Site Rowridge Rowridge Lane Rowridge Newport Isle of Wight" PO304HT (1 component)

Battery/generator UPS

Inactive • 2018-19 (T-1)
0.16 MW
"SANDY HEATH MAINTENANCE CENTRE Sandy Potton Bedfordshire" SG192NH (1 component)

Battery/generator UPS

Inactive • 2018-19 (T-1)
0.16 MW
Hollingdean Lane, Brighton, BN1 7BB (12 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hill Village Nadder Lane South Molton Devon EX36 4HP (10 components)
• 0.15MW of demand reduction
• 10 MW of demand reduction
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Hill Village Nadder Lane South Molton Devon EX36 4HP (3 components)
• 0.15MW of demand reduction
• 10 MW of demand reduction
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Hermitage Solar Farm Clayhill Farm Greenfield Road Westoning Bedford MK45 5JD (2 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Hermitage Solar Farm Clayhill Farm Greenfield Road Westoning Bedford MK45 5JD (1 component)

Demand reduction

Inactive • 2018-19 (T-1)
Haywood Grange PV Farm Heywood Grange Tickhill Lane Dilhorne Stoke-on-Trent ST10 2PL (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (9 components)

load curtailment at site

Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Harmsworth Quays Printing Ltd, Oliver Road, GRAYS, RM20 3ED (13 components)
• Back up generation
• Onsite generation
Inactive • 2019-20 (T-1), 2018-19 (T-1) ...
2.32 MW
Harmsworth Quays Printing Ltd, Oliver Road, GRAYS, RM20 3ED (2 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Hampton Loade Treatment Works Hampton Loade Quatt Bridgnorth    WV15 6HD     (6 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Gyron Campus Data Centre, Spring Way, Hemel Hempstead, Herts, HP2 7SU (3 components)

Large data centre with back up generator on site

Inactive • 2018-19 (T-1)
8.63 MW
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (3 components)

Demand reduction

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Grimsargh Solar Limited Grimsargh Preston Lancashire PR2 5LE (1 component)

Demand reduction

Inactive • 2018-19 (T-1)
GRIFFITHS ROAD, LOSTOCK GRALAM, CW9 7XU (5 components)

gas generation

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Greenforge Lane Prestwood Stourbridge DY7 5BB (4 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Greenforge Lane Prestwood Stourbridge DY7 5BB (2 components)

Back up generation

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate West Lothian EH48 5AP (3 components)

Gowanbank Water Pumping Station

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Gowanbank TWP Gowanbank Armadale Bathgate West Lothian EH48 5AP (1 component)

Gowanbank Water Pumping Station

Inactive • 2018-19 (T-1)
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (5 components)

Glenhove Water Pumping Station

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Glenhove TWP 1 Cumbernauld North Lanarkshire G67 4AA (1 component)

Glenhove Water Pumping Station

Inactive • 2018-19 (T-1)
Gillmoss MRF, Bridgehouse Lane, Liverpool L10 5HA (15 components)

Materials recycling plant.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Friar's Pride Oxney Rd, Peterborough, PE1 5YW, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations