Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4 unique locations (43 components)

1 Waterfront Avenue, Edinburgh, EH5 1SG (24 components)
• Glenhove Water Pumping Station
• Office site with behind the meter generation
• On-site existing CHP generating unit
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
0.81 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (5 components)
• 1.200MW of battery storage located at Hook.
• Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
• Unproven DSR yet to be procured
Active • 2028-29 (T-4), 2020-21 (T-4) ...
0.11 MW
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (9 components)
• Gas fired CHP unit
• Hungry Snout Water Pumping Station
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2022-23 (T-3) ...
Transport Yard near Entrance, Landwade Road, Exning, Newmarket, Suffolk, CB8 7NR (5 components)
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Loading map...
Showing 4 locations