Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

79 unique locations (413 components) - Page 1 of 4

Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (3 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wolverhampton Powerhouse, Commercial Road, Wolverhampton WV1 3QS (2 components)
• A 4MW generating gas grid support plant.
• A 4MW generating grid support plant.
Inactive • 2021-22 (T-4), 2018-19 (T-1)
West Carr Lane, Hull HU7 0BS, UK (4 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (3 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.07 MW
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unproven DSR yet to be procured (24 components)

Unproven DSR yet to be procured

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (4 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
To be Determined (6 components)
• Aggregated Generation - CHP, AD & Hydro
• Aggregated Generation - Diesel
Active • 2024-25 (T-4), 2023-24 (T-4) ...
To be determined (28 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
141.16 MW
The Yard, Holme Road, Stoney Holme, Burnley (1 component)

3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure

Inactive • 2021-22 (T-4)
The Mall, Patchway, Bristol, BS34 5QT (5 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
0.77 MW
Thearne Lane Woodmansey Beverley HU17 0SA (3 components)

Two gas CHP engines in commercial horticultural environment with no auxilliary load

Active • 2025-26 (T-4), 2023-24 (T-4) ...
1.13 MW
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (2 components)
• CHP engine in horticultural environment with no auxilliary load
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2023-24 (T-4) ...
17.46 MW
TBD (15 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation.
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (4 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Salvesen Way, Brighton Street Industrial Estate, Hull HU3 4XN, UK (4 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Roydon Recycling Newport 1, Blackwood Business Park, Newport Rd, Pontllanfraith, Blackwood NP12 2XN, United Kingdom (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Roydon Recycling Newport 1, Blackwood Business Park, Newport Rd, Pontllanfraith, Blackwood NP12 2XN, United Kingdom (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Roydon & Ltd Swinton - Unit 1 Junction Eco Park,, Rake Lane, Swinton. M27 8LU, United Kingdom (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Rothesay Dock, Glasgow, G81 1LX (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Recycling Centre, Warren Way, Forest Town, Mansfield, NG19 0FL (3 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.07 MW
Queenborough Road, Sheerness ME12 3RL (2 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Power Station Road Isle of Grain Rochester ME3 0AR (14 components)
• Grain B CCGT Unit 6 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Loading map...
Showing 25 locations