DSR (Demand Side Response)
340 unique locations (2545 components) - Page 1 of 14
YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (10 components)
In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, West Midlands, WV1 2HS (3 components)
Gas generators
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (7 components)
3 x 1.6MW POSGU (standby generation)
WILSTHORPE WS, WILSTHORPE, PE9 4PD (6 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (4 components)
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (4 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (3 components)
Flour & semolina milling business
West Carr Lane, Hull HU7 0BS, UK (6 components)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Weighbridge Road, Shotton, Deeside, CH5 2LL (14 components)
Paper mill industrial site
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)
Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 component)
Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
WANSFORD INTAKE, WANDSFORD, PE8 6LG (3 components)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (10 components)
Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (8 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Unproven DSR yet to be procured (46 components)
Unproven DSR yet to be procured
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (11 components)
Unit A, The Loddon Centre, Basingstoke, Hampshire, RG24 8QW (3 components)
Gas generators
Unit 6, Lime Kilns Business Park, Hinckley, Leicestershire, LE10 3EL (6 components)
Gas generators
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (5 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (5 components)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (5 components)
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (8 components)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
To be Determined (18 components)
To be determined (77 components)
Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.