Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

155 unique locations (1758 components) - Page 1 of 7

XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (7 components)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (10 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (5 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Windsor Road, Redditch, Worcestershire, B97 6EF (6 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Wimbourne Bournemouth BH21 5EP (5 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
West Carr Lane, Hull HU7 0BS, UK (6 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Weighbridge Road, Shotton, Deeside, CH5 2LL (14 components)

Paper mill industrial site

Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (4 components)

29MW of DSR

DSR LIMEJUMP LTD Not Prequalified CM3
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (10 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (5 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (11 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (5 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (4 components)

2MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Trostre Works Llanelli Carmarthenshire SA14 9SD (187 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2024-25 (T-1) ...
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
To be Determined (18 components)
• Aggregated Generation - CHP, AD & Hydro
• Aggregated Generation - Diesel
Active • 2024-25 (T-4), 2023-24 (T-4) ...
To be determined (77 components)

Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.

DSR Do Not Use Not Prequalified
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
141.16 MW
To be confirmed once CMU components are known (79 components)

To be confirmed once CMU components are known

DSR E.ON UK PLC Conditional
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
159.26 MW
TH Clements, W End Road, Benington, Boston, PE22 0EJ (8 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
TBD (30 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Load reduction upon instruction
DSR GRIDBEYOND LIMITED Not Prequalified
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
tbc (21 components)

Aggregate CMU from multiple sources

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Tameside General Hospital, Ashton Under Lyme, OL6 9RW (5 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations