DSR (Demand Side Response)

2 unique locations (44 components)

Main Site Energy Centre Main Road Hale Common Arreton Newport Isle of Wight PO30 3AR (36 components)
• (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S23G01 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% due to age).
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Hem Heath, Sir Stanley Matthews Way, Trentham Lakes, Trentham, Stoke on Trent, ST4 8GR (8 components)
• Gas fired reciprocating engine(s)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Loading map...
Showing 2 locations