Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

185 unique locations (2763 components) - Page 1 of 8

XPO - Warrington, 48 Hardwick Grange, Woolston, Warrington WA1 4RF, United Kingdom (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
XPO - Southampton, Goodward Road, Eastleigh, SO50 4NT (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
11.96 MW
XPO - Logistics Luton, Skimpot Road, Luton LU4 0JD (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
XPO - Logistics Bedworth, St. Davids Way, Bermuda Park, Nuneaton, Warwickshire CV10 7SD  (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
17.61 MW
XPO - Easton, Easton, Grantham, NG33 5AU (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
11.60 MW
Wrexham Industrial Estate Wrexham LL13 9UG (17 components)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Wormald Green, Land North of Sunnyside Gardens, Harrogate HG3 3RX (9 components)

8MW Energy Storage facility located in Harrogate.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (12 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
WOLVERHAMPTON BATTERY STORAGE, 34 COMMERCIAL ROAD, WOLVERHAMPTON, WEST MIDLANDS, WV1 3RD (8 components)

4MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Windsor Road, Redditch, Worcestershire, B97 6EF (9 components)

The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wimbourne Bournemouth BH21 5EP (7 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
West Carr Lane, Hull HU7 0BS, UK (9 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Weighbridge Road, Shotton, Deeside, CH5 2LL (26 components)

Paper mill industrial site

Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
48.00 MW
Water Pumping Station Middlemead West Hanningfield Chelmsford Essex CM3 8HS (6 components)

29MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Waterhouse Mills, Beetham, Milnthorpe, Cumbria, LA7 7AR (23 components)

Paper products manufacturing site carrying out DSR by load turn-down

Active • 2028-29 (T-4), 2026-27 (T-4) ...
20.01 MW
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (14 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.07 MW
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
UPM Shotton Weighbridge Road Shotton Deeside CH5 2LL (8 components)

19 MW of demand reduction

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
16.37 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
30.00 MW
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unit 1, Ocean Trade Centre, Minto Ave, Aberdeen AB12 3JZ, UK (7 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
UCB, Spital Lane, Chesterfield, Derbyshire, S41 0EX (16 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2024-25 (T-4) ...
12.18 MW
T Soanes Poultry Church Hill Road Middleton-on-the-wolds Driffield YO25 9UG (6 components)

2MW of DSR

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.72 MW
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-1) ...
120.35 MW
Toll Bridge Rd, Eyemouth TD14 5GN, United Kingdom (14 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations