17 unique locations (296 components)

to be provided once CMU Components are known (91 components)
• Aggregated Generation - Diesel
• The CMU component is an aggregation of turn-down and onsite generation
• to be provided once CMU Components are known
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
91.69 MW
Tir John N Rd, St Thomas, SA1 8NZ (10 components)
• 10 MW of demand reduction
• Reciprocating engines
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
Runcton Nursery, Lagness Road, Chichester PO20 1LJ (16 components)
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Two gas CHP in a horticultural environment with no aux load
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Royal South Hants Hospital, Graham Road, Southampton, Hampshire, SO14 0YG (23 components)
• 0.725MW Combined Heat and Power Plant Royal South Hants Hospital
• Component has yet to be procured.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.83 MW
Pengarnddu Ind Est, Dowlais Top CF48 2TA - Please see additional information note accompanying connection agreements. (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2022-23 (T-4)
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Main Ave, Hirwaun, CF44 9UY - Please see additional information note accompanying connection agreements. (1 component)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2022-23 (T-4)
Harts Farm Way, Havant, PO9 1HS (4 components)
• Aggregate CMU from multiple sources
• Gas fired reciprocating engines
Inactive • 2022-23 (T-4), 2019-20 (T-1)
EDF Energy (Thermal Generation) Limited, Cottam Power Station, Outgang Lane, Cottam, Retford, DN22 0NP (46 components)
• 2MW - 2.3MWh Battery Energy Storage System
• CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand or reduction.
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. Placeholder component for empty Unproven DSR CMU - Load Reduction upon instruction
Active • 2027-28 (T-4), 2025-26 (T-4) ...
1528.52 MW
Cauldon Works, Yelsway Ln, Cauldon, Stoke-on-Trent ST10 3EQ (7 components)

Cauldon Cement plant site - DSR participation through on-site shut down/ pause in production etc.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Brunel Way, Briton Ferry, SA11 2GA (14 components)
• Gas fired reciprocating engines.
• Processing station installed on site will provide real time consumption data for the site which will be recorded and aggregated with readings from the rest of the CMU components.
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
12.83 MW
Brook Farm, Arncott, OX25 1NY (2 components)
• Gas fired reciprocating engines.
• N/A
Inactive • 2022-23 (T-4)
Bailey Drive Gillingham Business Park Gillingham ME8 0WG (1 component)

Load reduction

Inactive • 2022-23 (T-4)
Ashford Rd, Charing TN27 0DF, United Kingdom (10 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• N/A
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.45 MW
Asda Northampton Thornton, Thorton Rd Kingsthorpe, Northampton, NN2 6LS (11 components)
• Gas reciprocating engines
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2023-24 (T-1) ...
13.36 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (8 components)
• Component has yet to be procured.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• To be confirmed once CMU components are known
Active • 2024-25 (T-4), 2023-24 (T-4) ...
42.84 MW
2600 John Smith Drive, Oxford, OX4 2JY (35 components)
• Generating Unit 1
• Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
• Operational gas reciprocating engine.
Active • 2024-25 (T-4), 2023-24 (T-4) ...