Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

14 unique locations (259 components)

111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
• N/A
Active • 2028-29 (T-4), 2027-28 (T-4) ...
403.07 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• N/A
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.14 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
Ardagh Group - Barnsely Site 1, Burton Road, Monk Bretton South Yorkshire S71 5RP (15 components)
• Gas-fired CHP unit
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
16.24 MW
Barrow Man Road Birchington Kent CT7 0AX (13 components)
• Load curtailment
• Syngenta - CHP unit
• Two CHP engines in horticultural environment with no auxilliary load
Active • 2028-29 (T-4), 2025-26 (T-4) ...
10.22 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
214.92 MW
Gowanbank TWP Gowanbank Armadale Bathgate West Lothian EH48 5AP (3 components)
• Gowanbank Water Pumping Station
• Ratcliffe Unit 1 coal-fired unit
Inactive • 2022-23 (T-4), 2018-19 (T-1)
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
236.69 MW
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (4 components)
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Suffolk EfW Lodge Lane Great Blakenham Ipswich, Suffolk IP6 0JE (16 components)
• Energy facility comprising of reciprocating engine sets.
• Existing Energy from Waste Plant
• Load reduction on site supported by non-exporting standby generation.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
64.04 MW
Loading map...
Showing 14 locations