20 unique locations (253 components)

Saltend Lane, HULL, HU12 8PP (29 components)
β€’ Load reduction
β€’ Load reduction on site
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Neachley Ln, Shifnal TF11 8PQ (15 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
MytheΒ Road. Tewkesbury. Gloucester. GL20 6AA (15 components)

Load reduction on site supported by non-exporting standby generation. (5)

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Manchester Rd, Carrington, Manchester M31 4TG (30 components)

load curtailment at site

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
12.59 MW
Leek STW, Off Cheddleton Rd, Leekbrook, Leek, ST13 7AU (15 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Hempstead Lane, Hempstead, Gloucester GL2 5LF (14 components)
β€’ A standby diesel generator on a waste water treatment works.
β€’ A standby diesel generator on a waster water treatment works.
β€’ Load curtailment at site
β€’ ... and 2 more unique descriptions
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Heathlands Farm, Honey Hill, Wokingham, RG40 3BG (12 components)
β€’ Water source Heat Pumps at 1883KW each
β€’ Water source Heat Pumps at 1883KW each - located at Horticultural site
β€’ Water source heat pump at 1883kW each
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Elphinstone Research Centre, Tranent EH33 2NE (4 components)
β€’ Load drop
β€’ Load drop by on-site generation
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Dock Yard Rd, Ellesmere Port, CH65 4EG (10 components)
β€’ BtM storage as standby generation, non-exporting
β€’ BtM storage providing standby capacity
β€’ BtM storage/standby generation; non exporting
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
Deansford Lane, DY10 4NB (15 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Coldstore 3, Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (11 components)
β€’ Load drop.
β€’ Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
BRADWELL DBS PUMPING STATION, STRETFIELD, BRADWELL, HOPE VALLEY, DERBYSHIRE, S33 9JT (5 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Asda Skelton, Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
β€’ Load curtailment
β€’ Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
Asda Scunthorpe, Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (9 components)
β€’ Load drop
β€’ Load reduction on flexible electricity consuming processes
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
Asda Leek, Meerbrook, Leek, Staffordshire, ST13 8SN (8 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Asda, EVESHAM ROAD, BROADWAY, WORCESTERSHIRE, WR12 7PA (9 components)

Load reduction on site supported by non-exporting standby generation.

Active β€’ 2027-28 (T-4), 2026-27 (T-4) ...
Asda Dyce, Cairnton Road, Boyndie, Banffshire, AB45 2LR (8 components)
β€’ Standby diesel generator that reduces site load when generating.
β€’ Standby generation
β€’ Standby generation from a POSGU.
Inactive β€’ 2023-24 (T-4), 2022-23 (T-3) ...
Asda Didcot, Harrier Park, Hawksworth, Didcot, Oxfordshire, OX11 7PL (25 components)

load curtailment at site

Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
Asda Chesterfield, Coldstore 5, 1B Park Road, Holmewood Industrial Park, Chesterfield S42 5UY (9 components)

Load reduction on flexible electricity consuming processes (3)

Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
5.82 MW