Walton-on-Thames WTW, Hurst Road, , Walton-on-Thames, United Kingdom, KT12 2EG (4 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.09 MW
Ratcliffe-on-Soar Nottingham NG11 0EE (77 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe U4 auxiliary gas turbine. Note this Generating Unit is fuelled on Diesel as specified by BS EN590
Active • 2028-29 (T-4), 2026-27 (T-4) ...
3602.30 MW
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (17 components)
• 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
14.85 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lunar Freezing - Fraserburgh, 46-50 Shore St, Fraserburgh AB43 9BT, UK (5 components)
• Connah's Quay PS Unit 2 CCGT
• Energy from Waste Recovery Facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (25 components)
• Refurbishment Unit 4 Cruachan pump storage hydro plant
• Unit 1 Cruachan pumped storage hydro plant
• Unit 2 Cruachan pumped storage hydro plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
827.61 MW
LAND ON THE NORTH SIDE OF DESFORD ROAD, ENDERBY, LEICESTER, LE19 3LR (18 components)
• Battery Storage Plant
• Small gas fired OCGT.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
98.37 MW
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (26 components)
• Gas peaking reciprocating engine
• On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383
• Reciprocating genset
Active • 2028-29 (T-4), 2027-28 (T-4) ...
236.69 MW
Land off Amy Johnson Way, Blackpool, FY4 2RS (14 components)
• A gas fuelled generating station.
• Connah's Quay PS Unit 1 CCGT
• Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
Active • 2028-29 (T-4), 2023-24 (T-4) ...
6.54 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (17 components)
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
• Connah's Quay PS Unit 1 CCGT
Active • 2026-27 (T-4), 2025-26 (T-4) ...
156.98 MW
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (3 components)
• DSR Component providing load turn down at a data centre
• OCGT from Grain U4. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Component has yet to be procurred (226 components)
• Component has yet to be procurred
• District heating implementation with one asset 1MW and no auxiliary load
• Poole Existing Site CHP
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1238.88 MW
ACS&T - Grimsby - Site 2, Estate Road 2, South Humberside Trading Estate, Grimsby DN31 2TG (17 components)
• Grain B CCGT Unit 8 CHP element is via supply of heat to Grain LNG regasification facility
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU is composed of two CHPs (ECOMAX® 15 NGS) with an electrical output capacity of 1.501 MWe each. The CMU will supply electricty on site to METTIS AEROSPACE LIMITED.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
22.34 MW
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (90 components)
• E1000 CHP
• Existing CCGT
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
2435.45 MW
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (10 components)
• N/A
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 MW.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.14 MW
111 Brancroft Way Enfield Middlesex EN3 7PL (12 components)
• Enfield CCGT Power Station - (one unit station)
• Maentwrog hydroelectric station is a 30MW plant near Blaenau Ffestiniog- Gwynedd. The plant was constructed in 1928 features two 15MW units and takes its water feed from the Llyn Trawsfynydd Reservoir. The plant is restricted to the quantity of water it can use as minimum water levels must be maintained in the resevoir. The plant has a connection capacity of 35300kVA and an associated power factor of 0.85.
• N/A
Active • 2028-29 (T-4), 2027-28 (T-4) ...
403.07 MW
Loading map...