DSR (Demand Side Response)

94 unique locations (4908 components) - Page 1 of 4

WN6 (97 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
126.73 MW
WA4 (169 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
233.36 MW
TN3 (60 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
118.92 MW
TN11 (48 components)

Domestic EV charger

Active • 2025-26 (T-1), 2025-26 (T-4) ...
102.87 MW
TARNSIDE ROAD ORRELL WIGAN LANCASHIRE WN5 (3 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
132.47 MW
TAILLAR ROAD HEDON HULL HU12 (3 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
0.06 MW
SW13 (15 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
26.11 MW
SO31 (152 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
186.60 MW
SO24 (48 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
66.96 MW
SN6 (78 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
83.31 MW
SG5 (109 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
163.46 MW
SG1 (73 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
94.95 MW
SA48 (7 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
14.08 MW
S25 (50 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
70.65 MW
RM2 (30 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-1) ...
26.07 MW
Richmond Lndn George St - West London TW9 1HF (1 component)

Commercial sites

Active • 2024-25 (T-1)
2.05 MW
RH17 (87 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
82.24 MW
RH14 (50 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
110.37 MW
PE6 (98 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
243.51 MW
PE28 (193 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
432.26 MW
PE10 (66 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
110.93 MW
PA23 (11 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
66.23 MW
OUSEGATE SELBY YO8 (3 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
OL15 (35 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-1), 2025-26 (T-4) ...
7.08 MW
NN3 (100 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
221.16 MW
Loading map...
Showing 25 locations